The OVWRC regularly encounters unscheduled down time due to aluminum jamming in their aluminum conveyance system. They propose to replace the existing system with a larger diameter tube and blower. The total cost of the project is approx. $60k with a projected savings of under 2 yrs. CIF has contributed $26,370 to the project representing up to 44% of costs.
Documents | Interim Report: Aluminum Blower Replacement
Final Report: Aluminum Blower Replacement |
Blog Post | |
Related Projects | Project #656.12 |
Categories | Best Practices | MRF | Operations | Processing | |